Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636332

- Product Categories
- Friendly Links
Information Name: | Coal rods impeller _ _ Hefei, Zhengzhou Coal stick machine light mao Machinery |
Published: | 2015-01-14 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Coal stick machine main points: 1, the need to temporarily stop work (usually no more than two hours), stop former requires adequate water to ensure that the water content in the 15 percent to about 20 percent in order to avoid downtime go inside the barrel during water loss, dry materials for the next smooth start. 2, when the result of downtime after a reboot, if unsuccessful should stop twice to start to start, check the cause and troubleshoot or remove the material before starting the machine. If forced to start it may cause damage to the equipment. 3, the current is the main parameter to measure the equipment load and degree of coal stick tight squeeze, is the main basis for the operator to control the device. There are two methods to adjust the current: adding water or adjusting the amount of coal to the feed port. 4, the operator should always pay attention to the material circumstances of rods coal feeding the mouth, and when a large number of materials should be tossed in the hopper attention to the quantity of coal to reduce rods machine manufacturers, but try not to pay attention to cutting, in order to avoid the spray material phenomenon. If the excessive accumulation of materials inside the bucket should be within the material with a thin bamboo stick stabbed machine (with an iron bar or prohibit excessive hardness tool poke materials). 5, if the head squeeze thirty percent more coal hole hole blocked coal rods machine when not stick, you should head down to remove the blocked drain hole before you continue. 6, when replacing worn propeller, the propeller should be newly installed near the bearing housing on one end, and the wear on the impeller by the smaller end of the handpiece. 11, feeding the housing and bearing connection end with the isolation chamber, avoiding material directly into the bearings and mechanical damage. When a small amount of material passing through the membrane into the isolation chamber should be promptly discharged through the lower part of the material discharge hole, the class must ensure that clean-up once. Coal gasification level bar machine how to improve the strength of rods hollow high pressure coal gasification coal rods machine is lower than the level of quality lump coal gasification, to improve the level of coal gasification stick, first we must work hard on materials management and production of coal rods, in gasification process and gasification equipment should make the appropriate transformation, we believe, we should focus on the following aspects. 1, as far as possible ensure better and more stable source of coal. 2, the southern humid rainy season, piling up in the open air among the coal moisture often up to 10%, which would increase the adhesive does not go in, it should be equipped with sufficient area coal shed, should be able to reserve more than half of the amount of dry coal the amount. 3. The quality of coal rods, gasification process and the impact of the premise consumption. For the preparation of high-quality coal rods, we must grasp all aspects of the coal preparation broken stick, retting, binder preparation, moisture control, coal rod diameter, etc., on a regular basis to detect the intensity of coal rods, intensity passing rate to reach 90 % the above. 4, wet bar coal gas required to maintain a high level and a suitable dry distillation furnace surface temperature, therefore, should be adjusted accordingly gasification of coal when the change stick, to maintain proper temperature furnace surface coal briquette stick machine, enough to dry distillation dry layer, slightly higher bottom temperature, the appropriate amount of steam and air volume, follow the blow on the gasification process (steam) strong and (time) is short, the next blow (steam) and weak (time) long principle, to maintain an appropriate level of fire, add charcoal and ash should be adjusted accordingly. 5, high-pressure coal coal rods hollow stick machine machine process is not bound to time and add charcoal furnace conditions worsen, therefore, should attach great importance to the maintenance and management of the production of coal rods and coal stick devices to be equipped with adequate transport coal rods, ensure coal rods in the quality and quantity can be made at any time to meet the needs of gas. Coal rods impeller _ _ Hefei, Zhengzhou Coal stick machine machinery provided by the Zhengzhou Light Mau Mau City Light Machinery Manufacturing Company Limited. Zhengzhou City-mao Machinery Manufacturing Co., Ltd. (www.gmjxzz.com) strong, credible, in Zhengzhou, Henan's industry-specific equipment industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Zhengzhou light mao Machinery and you hand into the brilliant, for a better future! |
Admin>>>
You are the 7789 visitor
Copyright © GuangDong ICP No. 10089450, Zhengzhou City-mao Machinery Manufacturing Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 7789 visitor
Copyright © GuangDong ICP No. 10089450, Zhengzhou City-mao Machinery Manufacturing Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility